Int J Performability Eng ›› 2021, Vol. 17 ›› Issue (1): 1-13.doi: 10.23940/ijpe.21.01.p1.113
• Orginal Article • Next Articles
Bouzouada Abdallaha, Yssaad Benyssaadb*, Daoud Mohamedcd, Bekkouche Benaissac, and Yagoubi Benabdellahc
Submitted on
;
Revised on
;
Accepted on
Contact:
* Corresponding author. About author:
Bouzouada Abdallah, Yssaad Benyssaad, Daoud Mohamed, Bekkouche Benaissa, and Yagoubi Benabdellah. Maintenance Optimization for Complex System using Evolutionary Algorithms under Reliability Constraints within the Context of the Reliability-Centered-Maintenance [J]. Int J Performability Eng, 2021, 17(1): 1-13.
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
1. | B. Yssaad, M. Khiat,A. Chaker, “Reliability Centered Maintenance Optimization for Power Distribution Systems,” International Journal of Electrical Power and Energy Systems, Vol. 55, pp. 108-115, February 2014 |
2. | B. Yssaad, “Optimization of the Maintenance based on the Approach of the Techniques of Modelling and Simulation: Application to the Networks of Transport and Interconnection,” Doctoral thesis, ENPO Oran Algeria, January 2014 |
3. | B. Yssaad, M. Khiat,A. Chaker.“Reliability Centered Asset Maintenance Optimization for Power Distribution Systems,” IREMOS International Review on Modelling and Simulations, Vol. 6, No. 1, Part A, February 2013 |
4. | M. A. da Rosa, A. M. Leite da Silva, and V. Miranda, “Multi-Agent Systems Applied to Reliability Assessment of Power Systems,” International Journal of Electrical Power and Energy Systems, Vol. 42, No. 1, November 2012 |
5. | D. E. Nordgård, “A Framework for Risk-Informed Decision Support in Electricity Distribution Companies Utilizing Input from Quantitative Risk Assessment,” International Journal of Electrical Power and Energy Systems, Vol. 43, No. 1, December 2012 |
6. | L. Chang and Z. G. Wu, “Performance and Reliability of Electrical Power Grids under Cascading Failures,” International Journal of Electrical Power and Energy Systems, Vol. 33, No. 8, October 2011 |
7. | M. Malik, “Reliable Preventive Maintenance Scheduling,” A I I E Transactions, Vol. 11, No. 3, pp. 221-228, 1979 |
8. | T. Nakagawa, “Sequential Imperfect Preventive Maintenance Policies,” IEEE Transactions on Reliability, Vol. 37, No. 3, pp. 295-298, 1988 |
9. | A. Khatab, D. Ait-Kadi,N. Rezg, “Availability Optimisation for Stochastic Degrading Systems under Imperfect Preventive Maintenance,” International Journal of Production Research, Vol. 52, No. 14, pp. 4132-4141, 2014 |
10. | A. Khatab, C. Diallo,I. B. Sidibe, “Optimizing Upgrade and Imperfect Preventive Maintenance in Failure-Prone Second-Hand Systems,” Journal of Manufacturing Systems, Vol. 43, Part 1, pp. 58-78, April 2017 |
11. | X. Zhou, L. Xi,J. Lee, “Reliability-Centered Predictive Maintenance Scheduling for a Continuously Monitored System Subject to Degradation,” Reliability Engineering and System Safety, Vol. 92, No. 4, pp. 530-534, 2007 |
12. | X. Zhou, Y. Li, L. Xi,J. Lee, “Multi-Phase Preventive Maintenance Policy for Leased Equipment,” International Journal of Production Research, Vol. 53, No. 15, pp. 4528-4537, 2014 |
13. | D. Lin, M. Zuo,R. Yam, “General Sequential Imperfect Preventive Maintenance Models,” International Journal of Reliability Quality and Safety Engineering, Vol. 7, No. 3, pp. 253-266, 2000 |
14. | C. H.Lie and Y. H. Chun, “An Algorithm for Preventive Maintenance Policy,” IEEE Transactions on Reliability, Vol. 35, No. 1, pp. 71-75, 1986 |
15. | X. Zhou, L. Xi,J. Lee, “Reliability-Centered Predictive Maintenance Scheduling for a Continuously Monitored System Subject to Degradation,” Reliability Engineering and System Safety, Vol. 92, No. 4, pp. 530-534, 2007 |
16. | I. Maatouka, N. Chebbo, E. Châtelet,I. Jarkass, “Preventive Maintenance Optimization for Multi States Series Parallel System,” Proceeding based on AIP Guide, Vol.2008, ISBN: 978-983-44483-63, 2013 |
17. | J. Kennedy and R. C. Eberhart, “Particle Swarm Optimization,” inProceedings of IEEE International Conference on Neural Networks, pp. 1942-1948, Piscataway, NJ, 1995 |
18. | J. Kennedy and R. C. Eberhart, “A Discrete Binary Version of the Particle Swarm Algorithm,” in Proceedings of IEEE International Conference on Systems,Man and Cybernetics, pp. 4104-4108, Orlando, FL, 1997 |
19. | M. K.Loganathan and O. P. Gandhi, “Maintenance Cost Minimization of Manufacturing Systems using PSO under Reliability Constraint,”International Journal of Systems Assurance Engineering and Management, DOI: 10.1007/s13198-015-0374-2, Springer, July 2015 |
20. | G. Sharma and P. C. Tewari, “Performability Analysis for Feeding Unit of a Sugar Plant using Particle Swarm Optimization Technique,” International Journal of Performability Engineering, Vol. 15, No. 11, pp. 2835-2842, 2019 |
21. | M. Alrifaey, T. S. Hon, A. As'arry, E. E. Supeni, and C. K. Ang, “Optimization and Selection of Maintenance Policies in an Electrical Gas Turbine Generator based on the Hybrid Reliability-Centered Maintenance (RCM) Model,”MDPI/Processes (2227 9717), 2020 |
22. | X. S. Yang, “Nature-Inspired Metaheuristic Algorithms,” Luniver Press, Frome, UK, 2008 |
23. | X. -S. Yang, “Firefly Algorithm, Lévy Flights and Global Optimization,” RDIS Research and Development in Intelligent Systems XXVI (Eds M. Bramer, R. Ellis, M. Petridis), Springer, London, pp. 209-218, 2010 |
24. | V. G. Mejlej, P. Falkenberg, E.Türck,T.Vietor, “Optimization of Variable Stiffness Composites in Automated Fiber Placement Process using Evolutionary Algorithms,” Procedia CIRP, Vol. 66, pp. 79-84, 2017 |
25. | N. F. Johari, A. M. Zain, N. H. Mustaffa,A. Udin, “Machining Parameters Optimization using Hybrid Firefly Algorithm and Particle Swarm Optimization,” inProceedings of the 6th International Conference on Computer Science and Computational Mathematics, 2017 |
[1] | Meroua Sahraoui and Ahmed Bellaouar. Improving Industrial Production Efficiency: A Hybrid Approach to Dynamic Scheduling - A Case Study [J]. Int J Performability Eng, 2025, 21(2): 104-111. |
[2] | Updesh Kumar Jaiswal and Amarjeet Prajapati. An Effective PSO-Driven Method for Test Data Generation in Branch Coverage Software Testing [J]. Int J Performability Eng, 2025, 21(1): 1-9. |
[3] | Archana Sharma and Dharmveer Singh Rajpoot. A DNN Anti-Predatory Algorithm-Based Model to Enhance the Efficiency of Software Effort Estimation [J]. Int J Performability Eng, 2025, 21(1): 10-23. |
[4] | Seema Kalonia and Amrita Upadhyay. Comparative Analysis of Machine Learning Model and PSO Optimized CNN-RNN for Software Fault Prediction [J]. Int J Performability Eng, 2025, 21(1): 48-55. |
[5] | Manu Banga. Enhancing Software Fault Prediction using Machine Learning [J]. Int J Performability Eng, 2024, 20(9): 529-540. |
[6] | Meenakshi Chawla and Meenakshi Pareek. A Hybrid Deep Learning Perspective for Software Effort Estimation [J]. Int J Performability Eng, 2024, 20(7): 442-450. |
[7] | Vipan and Raj Kumar. Hybrid Fuzzy-Neuro and DNN-Based Framework for VM Allocation and Resource Optimization in Cloud Systems [J]. Int J Performability Eng, 2024, 20(12): 733-740. |
[8] | Meenakshi Chawla and Meenakshi Pareek. Hybridizing Intelligence: A Comparative Study of Machine Learning Algorithm and ANN-PSO Deep Learning Model for Software Effort Estimation [J]. Int J Performability Eng, 2024, 20(11): 668-675. |
[9] | Me Me Khaing and N. Jeyanthi. EDocDeDup: Electronic Document Data Deduplication Towards Storage Optimization [J]. Int J Performability Eng, 2023, 19(7): 471-480. |
[10] | Linkai Chen, Honghui Fan, and Hongjin Zhu. Multi-Objective Optimization of Cancer Treatment Using the Multi-Objective Grey Wolf Optimizer (MOGWO) [J]. Int J Performability Eng, 2023, 19(7): 481-490. |
[11] | Yassine Eddouh, Abdelmajid Daya, Rabie Elotmani, and Abdelhamid Touache. Optimization Approaches for Cost Reduction in Preventive Maintenance Strategies: A Comparative Study [J]. Int J Performability Eng, 2023, 19(6): 359-367. |
[12] | Yassine Eddouh, Abdelmajid Daya, Rabie Elotmani, and Abdelhamid Touache. Imperfect Maintenance Model for Optimizing Air Compressor Availability [J]. Int J Performability Eng, 2023, 19(4): 263-272. |
[13] | Ashima Arya and Sanjay Kumar Malik. An Improved Firefly-Based Feature Selection Method for Software Fault Identification and Classification [J]. Int J Performability Eng, 2023, 19(11): 744-752. |
[14] | Jinxin Wang, Zhiping Zhai, Yuezheng Lan, Xiaoyi Zhai, and Lixiang Zhao. Reliability Analysis and Optimization of Forage Crushers Based on Bayesian Network [J]. Int J Performability Eng, 2023, 19(10): 700-709. |
[15] | Eshan Misra and Vibhuti. Microgrid Fuel Cost Optimization Considering Economic Emission using Whale Cat Hybrid Technique [J]. Int J Performability Eng, 2022, 18(7): 502-511. |
|