[1] |
K. Ainger , “An Integrated Management Method to Improve the Capability Factor of Nuclear Power Plant,” Daya Bay Nuclear Power Station, No. 4, pp. 76-80, 2011
|
[2] |
L. Loflin , “Advanced Nuclear Technology: Equipment Reliability for New Nuclear Plants: Industry Recommendations for Design,”EPRI, August 2010
|
[3] |
H. Zheng , “Calculation of Design Availability Factors for Unit 1 and 2 of Taishan Nuclear Power Plant,” Nuclear Science and Engineering, Vol. 32, No. 1, March 2012
|
[4] |
“Technical Specification for Operation of units 1 and 2 of TaishanNuclear Power Station,” Rev A, August 2014
|
[5] |
NESS-F DC 20136 A Periodic Test Completeness Note - VVP
|
[6] |
S.T. Pang and Y. H. Yang , “Optimization of Nuclear Power Station Overhaul Period,” Daya Bay Nuclear Power Station, No. 4,pp. 23-26, 2008
|
[7] |
PESS-F DC 20030 A DES TSN - Periodic Test Rules - VVP
|
[8] |
Daya Bay periodic test procedure- Fast closing Test of main Steam isolation Valve, Rev 13, November 2012
|
[9] |
Daya Bay periodic test procedure- Partial closure test of mainsteam isolation valve, Rev 13, November 2012
|
[10] |
Daya Bay operating procedure - Test of A Series Bypass Water isolation signal with RPA080CC, Rev C0, May 2011
|
[11] |
Daya Bay periodic test procedure- Main control valve closing time test, Rev 13, November 2012
|
[12] |
European Utility Requirements for LWR Nuclear Power Plants, vol. 2, Chapter 18, performance Assessments Methodology, Rev E, December 2016
|
[13] |
EPR Taishan Nuclear Power Plant, Probability Availability Analysis PAA Guidelines. Internal research report, 2012
|
[14] |
S. T. Pang and Y. H. Yang , “Optimization of Overhaul Period for Nuclear Power Plant,” Daya Bay Nuclear Power, No. 4, pp. 23-26, 2018
|
[15] |
D. G. Wang , “Study on the Management of Overhaul Period in Nuclear Power Operation Company, ”Master Thesis of University of Electronic Science and Technology, 2009
|