Int J Performability Eng ›› 2019, Vol. 15 ›› Issue (4): 1061-1072.doi: 10.23940/ijpe.19.04.p1.10611072
Ashutosh Sharmaa, Rajiv Kumara, and Pradeep Kumar Singhb, *
Revised on
;
Accepted on
Contact:
E-mail address: pradeep_84cs@yahoo.com
Ashutosh Sharma, Rajiv Kumar, and Pradeep Kumar Singh. SLA Constraint Quickest Path Problem for Data Transmission Services in Capacitated Networks [J]. Int J Performability Eng, 2019, 15(4): 1061-1072.
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
1 H. Liu, H. Ning, Q. Mu, Y. Zheng, J. Zeng, L. T. Yang, et al., “A Review of the Smart World,”Future Generation Computer Systems, 2017 2 E. Marilly, O. Martinot, H. Papini,D. Goderis, “Service Level Agreements: A Main Challenge for Next Generation Networks,” in 3 L. -J. Jin, V. Machiraju, and A. Sahai, “Analysis on Service Level Agreement of Web Services,”HP June, 2002 4 R. Kumar and P. Cholda, “A Framework for Continuity of Mission-Critical Network Services,” in 5 Y. Chen and Y. Chin, “The Quickest Path Problem,” 6 M. H. Moore, “On the Fastest Route for Convoy-Type Traffic in Flowrate-Constrained Networks,” 7 H. W.Hamacher and S. A. Tjandra, “Mathematical Modelling of Evacuation Problems: A State of Art,” 2001 8 H. I. Calvete, “The Quickest Path Problem with Interval Lead Times,” 9 G. -H. Chen and Y. -C. Hung, “On the Quickest Path Problem,” 10 Y. Chen, “Finding the k Quickest Simple Paths in a Network,” 11 J. C. Clímaco, M. M. Pascoal, J. M. Craveirinha,M. E. V.Captivo, “Internet Packet Routing: Application of a K-Quickest Path Algorithm,” 12 G. Ghiani and E. Guerriero, “A Lower Bound for the Quickest Path Problem,” 13 E. D. Q.V. Martins and J. L. E. Dos Santos, “An Algorithm for the Quickest Path Problem,” 14 C. -K. Park, S. Lee, and S. Park, “A Label-Setting Algorithm for Finding a Quickest Path,” 15 J. B. Rosen, S. -Z. Sun, and G. -L. Xue, “Algorithms for the Quickest Path Problem and the Enumeration of Quickest Paths,” 16 M. Pascoal, M. Captivo,J. Clímaco, “Computational Experiments with a Lazy Version of a K Quickest Simple Path Ranking Algorithm,” 17 M. M. Pascoal, M. E. V.Captivo, and J. C. Clı?maco, “An Algorithm for Ranking Quickest Simple Paths,” 18 B. Pelegrı?n and P. Fernández, “On the Sum-Max Bicriterion Path Problem,” 19 Y. -K. Lin, “Extend the Quickest Path Problem to the System Reliability Evaluation for a Stochastic-Flow Network,” 20 Y. -K. Lin, “Optimal Pair of Minimal Paths under Both Time and Budget Constraints,” 21 M. M. Pascoal, M. E. V.Captivo, and J. C. Clímaco, “A Comprehensive Survey on the Quickest Path Problem,” 22 H. I. Calvete, L. del-Pozo, and J. A. Iranzo, “Algorithms for the Quickest Path Problem and the Reliable Quickest Path Problem,” 23 H. I. Calvete, L. del-Pozo, and J. A. Iranzo, “The Energy-Constrained Quickest Path Problem,” 24 A. Sharma and R. Kumar, “A Framework for Pre-Computated Multi-Constrained Quickest QoS Path Algorithm,” 25 A. Sedeño-Noda and J. D. González-Barrera, “Fast and Fine Quickest Path Algorithm,” 26 H. I. Calvete, L. del-Pozo, and J. A. Iranzo, “Dealing with Residual Energy When Transmitting Data in Energy-Constrained Capacitated Networks,” 27 A. Sharma and R. Kumar, “Risk-Energy Aware Service Level Agreement Assessment for Computing Quickest Path in Computer Networks,”International Journal of Reliability and Safety, 2018 28 S. Ruzika and M. Thiemann, “Reliable and Restricted Quickest Path Problems,” Network Optimization, pp. 309-314, Springer, 2011 29 G. Xue, “End-to-End Data Paths: Quickest or Most Reliable?” 30 M. Ghiyasvand and A. Ramezanipour, “Solving the MCQP, MLT, and MMLT Problems and Computing Weakly and Strongly Stable Quickest Paths,” 31 N. Agatz, P. Bouman,M. Schmidt, “Optimization Approaches for the Traveling Salesman Problem with Drone,” 32 R. E. Shawi, J. Gudmundsson,C. Levcopoulos, “Quickest Path Queries on Transportation Network,” 33 D. Männel and A. Bortfeldt, “A Hybrid Algorithm for the Vehicle Routing Problem with Pickup and Delivery and 3D Loading Constraints,” 34 E. E. Zachariadis, C. D. Tarantilis,C. T. Kiranoudis, “The Vehicle Routing Problem with Simultaneous Pick-ups and Deliveries and Two-Dimensional Loading Constraints,” 35 D. -Y. Lin and Y. -T. Chang, “Ship Routing and Freight Assignment Problem for Liner Shipping: Application to the Northern Sea Route planning problem,” 36 M. Issabakhsh, S. -M. Hosseini-Motlagh, M. -S. Pishvaee, and M. Saghafi Nia, “A Vehicle Routing Problem for Modeling Home Healthcare: a Case Study,” 37 A. Sharma and R. Kumar, “An Optimal Routing Scheme for Critical Healthcare HTH Services—An IOT Perspective,” in 38 W. -W. Wu, A. Ning, and X. -X. Ning, “Evaluation of the Reliability of Transport Networks based on the Stochastic Flow of Moving Objects,” 39 W. Fawaz, B. Daheb, O. Audouin, M. Du-Pond,G. Pujolle, “Service Level Agreement and Provisioning in Optical Networks,” 40 G. Xie, G. Zeng, Y. Chen, Y. Bai, Z. Zhou, R. Li, et al., “Minimizing Redundancy to Satisfy Reliability Requirement for a Parallel Application on Heterogeneous Service-Oriented Systems,”IEEE Transactions on Services Computing, 2017 41 C. Gen-Huey and H. Yung-Chen, “Algorithms for the Constrained Quickest Path Problem and the Enumeration of Quickest Paths,” 42 M. L.Fredman and R. E. Tarjan, “Fibonacci Heaps and their Uses in Improved Network Optimization Algorithms,” 43 J. -C. Bolot, “End-to-End Packet Delay and Loss Behavior in the Internet,” in 44 S. Zhang, C. Martel,B. Mukherjee, “Dynamic Traffic Grooming in Elastic Optical Networks,” |
[1] | Zhiyang Zhang, Yonghua Li, Dongxu Zhang, Yuhan Tang, and Qing Xia. Reliability Evaluation of Flat Car Underframe based on GSA-BP Neural Network and Probability Box [J]. Int J Performability Eng, 2024, 20(6): 400-411. |
[2] | Kangjun Xu, Yonghua Li, Qi Gong, Dongxu Zhang, and Tao Guo. A Novel Fatigue Reliability Calculation Method Based on INGO-BPNN [J]. Int J Performability Eng, 2024, 20(5): 319-332. |
[3] | Darius Muyizere, Arcade Nshimiyimana, Theophile Mugerwa, Lawrence K. Letting, and Bernard B. Munyazikwiye. Reliability Assessment of Distribution System Grid-Connected Multi-Inverter for Solar Photo-Voltaic Systems: A Case Study [J]. Int J Performability Eng, 2024, 20(3): 149-156. |
[4] | Amit Kumar Singh and P. C. Tewari. An Overview of Reliability, Availability, Maintainability, and Safety Strategies for Complex Systems in Various Process Industries [J]. Int J Performability Eng, 2023, 19(12): 788-796. |
[5] | Yonghua Li, Shujian Liu, Xiaoning Bai, and Yufeng Wang. An Interval-Probability Hybrid Structural Reliability Calculation Method Based on CSSA-BR-BP [J]. Int J Performability Eng, 2023, 19(10): 687-699. |
[6] | Jinxin Wang, Zhiping Zhai, Yuezheng Lan, Xiaoyi Zhai, and Lixiang Zhao. Reliability Analysis and Optimization of Forage Crushers Based on Bayesian Network [J]. Int J Performability Eng, 2023, 19(10): 700-709. |
[7] | Yu-Lun Chao, Yi-Kuei Lin, and Cheng-Ta Yeh. AMC-Based Algorithm for Network Reliability Evaluation of a Manufacturing System with Scrapping and Rework [J]. Int J Performability Eng, 2022, 18(4): 231-240. |
[8] | Madhumitha J, and G. Vijayalakshmi. Multi-State Performance Analysis of Linear Consecutive 2-out-of-4: F System using Markov Reward Model [J]. Int J Performability Eng, 2022, 18(12): 903-910. |
[9] | Risu Na, Weiguo Zhang, Kaifa Jia, and Quan Zhang. Key Factors of Seal Ring Reliability based on QFD [J]. Int J Performability Eng, 2022, 18(11): 759-769. |
[10] | Tae-Jin Yang. Comparative Analysis on the Reliability Performance of NHPP Software Reliability Model Applying Exponential-Type Lifetime Distribution [J]. Int J Performability Eng, 2022, 18(10): 679-689. |
[11] | Surbhi Gupta, H.D. Aroraa, Anjali Naithania, Anil Chandrab. Reliability Assessment of the Planning and Perception Software Competencies of Self-Driving Cars [J]. Int J Performability Eng, 2021, 17(9): 779-786. |
[12] | Tyler D. Ridder and Ram M. Narayanan. Radar Detection Performability under Graceful Degradation [J]. Int J Performability Eng, 2021, 17(8): 666-675. |
[13] | Yi-Chun Cheng, Yi-Kuei Lin, and Ping-Chen Chang. Reliability Evaluation for a Multistate Network with Time Attribute and Periodical Maintenance [J]. Int J Performability Eng, 2021, 17(8): 676-685. |
[14] | Yi-Fan Chen, Yi-Kuei Lin, and Cheng-Fu Huang. Using Deep Neural Networks to Evaluate the System Reliability of Manufacturing Networks [J]. Int J Performability Eng, 2021, 17(7): 600-608. |
[15] | Youssef Bassir, Achraf Wahid, Abdelkarim Kartouni, and Mohamed ELghorba. Estimation of Wire Rope Reliability by Two Analytical Approach [J]. Int J Performability Eng, 2021, 17(7): 619-626. |
|