| [1]. | 
																						 
											 FaccioM., PersonaA., SgarbossaF. and ZaninG.  Sustainable SC through the complete reprocessing of end-of-life products by manufacturers: A traditional versus social responsibility company perspective. European Journal of Operational Research, 233(2), pp.359-373, 2014.
																						 | 
										
																													
																							| [2]. | 
																						 
											 BahubalendruniM.R.and VarupalaV.P.  Disassembly Sequence Planning for Safe Disposal of End-of-Life Waste Electric and Electronic Equipment. National Academy Science Letters, pp.1-5, 2020.
																						 | 
										
																													
																							| [3]. | 
																						 
											 MengK., LouP., PengX. and PrybutokV.  An improved co-evolutionary algorithm for green manufacturing by integration of recovery option selection and disassembly planning for end-of-life products. International Journal of Production Research, 54(18), pp.5567-5593, 2016.
																						 | 
										
																													
																							| [4]. | 
																						 
											 SmithS., SmithG. and ChenW.H.  Disassembly sequence structure graphs: An optimal approach for multiple-target selective disassembly sequence planning. Advanced engineering informatics, 26(2), pp.306-316, 2012.
																						 | 
										
																													
																							| [5]. | 
																						 
											 KhederM., TriguiM. and AifaouiN.  Disassembly sequence planning based on a genetic algorithm. Proceedings of the Institution of Mechanical Engineers, Part C: Journal of Mechanical Engineering Science, 229(12), pp.2281-2290, 2015.
																						 | 
										
																													
																							| [6]. | 
																						 
											 TsengY.  J., Yu, F.Y. and Huang, F.Y. A green assembly sequence planning model with a closed-loop assembly and disassembly sequence planning using a particle swarm optimization method. The International Journal of Advanced Manufacturing Technology, 57(9), pp. 1183-1197, 2011.
																						 | 
										
																													
																							| [7]. | 
																						 
											 ZhongL., YouchaoS., GabrielO.E.and HaiqiaoW.  Disassembly sequence planning for maintenance based on metaheuristic method. Aircraft Engineering and Aerospace Technology, 2011.
																						 | 
										
																													
																							| [8]. | 
																						 
											 ZhangX.F.and ZhangS.Y.  Product cooperative disassembly sequence planning based on branch-and-bound algorithm. The International Journal of Advanced Manufacturing Technology, 51(9-12), pp. 1139-1147, 2010.
																						 | 
										
																													
																							| [9]. | 
																						 
											 LiuX., PengG., LiuX. and HouY.  Disassembly sequence planning approach for product virtual maintenance based on improved max-min ant system. The International Journal of Advanced Manufacturing Technology, 59(5), pp.829-839, 2012.
																						 | 
										
																													
																							| [10]. | 
																						 
											 TianG., ZhouM. and ChuJ.  A chance constrained programming approach to determine the optimal disassembly sequence. IEEE Transactions on Automation Science and Engineering, 10(4), pp. 1004-1013, 2013.
																						 | 
										
																													
																							| [11]. | 
																						 
											 YuB., WuE., ChenC., YangY., YaoB.Z.and LinQ.  A general approach to optimize disassembly sequence planning based on disassembly network: A case study from automotive industry. Advances in Production Engineering & Management, 12(4), pp.305-320, 2017.
																						 | 
										
																													
																							| [12]. | 
																						 
											 ZhangX.  F., Yu, G., Hu, Z.Y., Pei, C.H. and Ma, G.Q. Parallel disassembly sequence planning for complex products based on fuzzy-rough sets. The International Journal of Advanced Manufacturing Technology, 72(1-4), pp.231-239, 2014.
																						 | 
										
																													
																							| [13]. | 
																						 
											 GunjiA.B., DeepakB.B.B.  V.L., Bahubalendruni, C.R.and Biswal, D.B.B. An optimal robotic assembly sequence planning by assembly subsets detection method using teaching learning-based optimization algorithm. IEEE Transactions on Automation Science and Engineering, 15(3), pp. 1369-1385, 2018.
																						 | 
										
																													
																							| [14]. | 
																						 
											 LiuJ., ZhouZ., PhamD. T., Xu, W., Ji, C. and Liu, Q., 2020. Collaborative optimization of robotic disassembly sequence planning and robotic disassembly line balancing problem using improved discrete Bees algorithm in remanufacturing. Robotics and Computer-Integrated Manufacturing, 61, p.101829.
																						 | 
										
																													
																							| [15]. | 
																						 
											 PistolesiF. and LazzeriniB.  TeMA: a tensorial memetic algorithm for many-objective parallel disassembly sequence planning in product refurbishment. IEEE Transactions on Industrial Informatics, 15(6), pp.3743-3753, 2019.
																						 | 
										
																													
																							| [16]. | 
																						 
											 PrakashP.K.S., CeglarekD. and TiwariM.K.  Constraint-based simulated annealing (CBSA) approach to solve the disassembly scheduling problem. The International Journal of Advanced Manufacturing Technology, 60(9-12), pp. 1125-1137, 2012.
																						 | 
										
																													
																							| [17]. | 
																						 
											 TianG., RenY., FengY., ZhouM., ZhangH. and TanJ.  Modeling and planning for dual-objective selective disassembly using AND/OR graph and discrete artificial bee colony. IEEE Transactions on Industrial Informatics, 15(4), pp.2456-2468, 2018.
																						 | 
										
																													
																							| [18]. | 
																						 
											 PornsingC. and WatanasungsuitA.  Discrete particle swarm optimization for disassembly sequence planning. In 2014 IEEE International Conference on Management of Innovation and Technology, pp.480-485, 2014.
																						 | 
										
																													
																							| [19]. | 
																						 
											 XuJ., ZhangS.Y.and FeiS.M.  Product remanufacture disassembly planning based on adaptive particle swarm optimization algorithm. Journal of Zhejiang University (Engineering Science), 45(10), pp. 1746-1752, 2011.
																						 | 
										
																													
																							| [20]. | 
																						 
											 LiuZ.F., YangD.J.and GuG.G.  Disassembly sequence planning based on particle swarm-simulated annealing optimization. Journal of Hefei University of Technology (Natural Science), 2, 2011.
																						 | 
										
																													
																							| [21]. | 
																						 
											 BahubalendruniM.R., BiswalB.B., and DeepakB.L.  Optimal robotic assembly sequence generation using particle swarm optimization. Journal of Automation and Control Engineering, 4(2),2016.
																						 | 
										
																													
																							| [22]. | 
																						 
											 ZhouZ., LiuJ., PhamD.  T., Xu, W., Ramirez, F.J., Ji, C. and Liu, Q. Disassembly sequence planning: Recent developments and future trends. Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture, 233(5), pp. 1450-1471, 2019.
																						 | 
										
																													
																							| [23]. | 
																						 
											 BahubalendruniM.R.and BiswalB.B.  A review on assembly sequence generation and its automation. Proceedings of the Institution of Mechanical Engineers, Part C: Journal of Mechanical Engineering Science, 230(5), pp.824-838, 2016.
																						 | 
										
																													
																							| [24]. | 
																						 
											 GulivindalaA.K., BahubalendruniM.R., VarupalaS. V. P. and SankaranarayanasamyK.  A Heuristic Method with a Novel Stability Concept to Perform Parallel Assembly Sequence Planning by Subassembly Detection. Assembly Automation, 40(5), pp.779-787, 2020.
																						 | 
										
																													
																							| [25]. | 
																						 
											 GulivindalaA.K., MattaV.R.and BahubalendruniM.R.  Disassembly Sequence Planning Methodology for EOL Products Through a Computational Approach. In Innovative Product Design and Intelligent Manufacturing Systems, pp.723-731, 2020.
																						 | 
										
																													
																							| [26]. | 
																						 
											 GrebenkovD.S.and SerrorJ.  Following a trend with an exponential moving average: Analytical results for a Gaussian model. Physica A: Statistical Mechanics and its Applications, 394, pp.288-303, 2014.
																						 | 
										
																													
																							| [27]. | 
																						 
											 PederseM. E. H. Good parameters for particle swarm optimization. Technical Report, No. HL1001, Hvass Laboratories, Copenhagen, Denmark, 2010.
																						 | 
										
																													
																							| [28]. | 
																						 
											 XuW., TangQ., LiuJ., LiuZ., ZhouZ. and PhamD.T.  Disassembly sequence planning using discrete Bees algorithm for human-robot collaboration in remanufacturing. Robotics and Computer-Integrated Manufacturing, 62, p. 101860, 2020.
																						 |