1. Kapur P. K., Panwar S., Singh O., & Kumar V. (2019). Joint release and testing stop time policy with testing-effort and change point. In Risk based technologies (pp. 209-222). Springer, Singapore. 2. Myers, G. J. (1976). Software reliability: Principles and practices. New York: Wiley. 3. Gupta V., Kapur P. K., Kumar D., & Singh S. P. (2019). Analytical evaluation of agile success factors influencing quality in banking sector. International Journal of Industrial and Systems Engineering, 33(3), 346-373. 4. Goepel K. D.2018. “Implementation of an Online Software Tool for the Analytic Hierarchy Process (AHP-OS).” International Journal of the Analytic Hierarchy Process 10 (3): 469-487. doi:10.13033/ ijahp.v10i3.590. 5. Ming-Lang Tseng, Yuan-Hsu Lin, Anthony S.F. Chiu, (2009) Fuzzy AHP-based study of cleaner production implementation in Taiwan PWB manufacturer. Journal of Cleaner Production, Volume 17, Issue 14, Pages 1249-1256, ISSN 0959-6526. https://doi.org/10.1016/j.jclepro.2009.03.022 (last accessed in December 2020). 6. Chun-Chin Wei, Chen-Fu Chien, Mao-Jiun J. Wang, (2005). An AHP-based approach to ERP system selection. International Journal of Production Economics, Volume 96, Issue 1, Pages 47-62, ISSN 0925-5273. 7. Klos, S. and Trebiina, P., (2014).Management and Production Engineering Review, Vol. 5, Issue 3,Pg. 14-22. DOI:10.2478/mper-2014-0023. 8. Tri, H., et al.(2016) Progress of agile movements in Australia: Propose a Universal Dynamic System Development Method (UDSDM) and universal framework. 7th International Conference on Information and Communication Systems (ICICS). IEEE. 9. Shelly, Comparative Analysis of Different Agile Methodologies. International Journal of Computer Science and Information Technology Research, 2015. 3(1): pp. 199-203. 10. Version O.,The 8th Annual “State of Agile” Survey. 2014. p. 1-14. 11. R. Singh, D. Kumar and B. B. Sagar, “Utility of Process Prioritization for Agile Software Testing using Analytical Hierarchical Process,” 2019 International Conference on Issues and Challenges in Intelligent Computing Techniques (ICICT), GHAZIABAD, India, 2019, pp. 1-6, doi: 10.1109/ICICT46931.2019.8977716. 12. Bhat, T. and Nagappan, N. (2006) “Evaluating the efficacy of test-driven development: industrial case studies”. Proceedings of the ACM/IEEE international symposium on Empirical software engineering, ACM: 356-363, 2006. 13. Huang, L. and Holcombe, H. (2009) “Empirical investigation towards the effectiveness of Test First programming”. Information and Software Technology, 51(1):182-194. 14. Brauers, W. K.M., Zavadskas,E.K. (2012). Robustness of MULTIMOORA, (2012). A Method for Multi-Objective Optimization.Informatica, (2012), 23(1), 1-25. 15. Kundakci, N.,(2016). Combined Multi-Criteria Decision Making Approach based on Macbeth and Multi-Moora methods. The journal of operations research, statistics econometrics and management information systems, 4(1), 17-26. 16. Görener A., Dinçer H., Hacıoğlu U. (2013). Application of Multi-Objective Optimization on the Basis of Ratio Analysis (MOORA) Method for Bank Branch Location Selection, International Journal of finance & banking studies, 2(2), 41-52. 17. Seema, Kaur, R., Kumar, D.(2014). Designing a mathematical model using fuzzy Based moora method for supplier selection. International Journal of Advanced Engineering Technology. 5(1), 16-24. 18. Gadakh, V.S.(2011). Application of MOORA Method for Parametric Optimization of Milling Process. International Journal of Applied Engineering Research, 1(4), 743-758. 19. Gupta V., Kapur P.K., Kumar D. (2016). Modelling and measuring code smells in enterprise applications using TISM and two-way assessment International Journal of System Assurance Engineering and Management,7(3). 332-340. 20. Zadeh, L.A., (1965). Fuzzy Sets. International Journal of Information and Control, 8, 338-353. 21. Saaty, T. L. (2008). Decision making with the Analytic hierarchy process. International Journal Services Sciences, 1(1), pp.83-98. |