Int J Performability Eng ›› 2018, Vol. 14 ›› Issue (12): 3014-3024.doi: 10.23940/ijpe.18.12.p11.30143024
Previous Articles Next Articles
Xiao Zhaoabc, Jianhua Yanga*(), and Xin Shibc
Revised on
;
Accepted on
Contact:
Yang Jianhua
E-mail:yangjh@ustb.edu.cn
Xiao Zhao, Jianhua Yang, and Xin Shi. Multi-Criteria Decision Model for Imperfect Maintenance using Multi-Attribute Utility Theory [J]. Int J Performability Eng, 2018, 14(12): 3014-3024.
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
[1] |
H.Z. Wang and H. Pham, “Some Maintenance Models and Availability with Imperfect Maintenance in Production Systems,” Annals of Operations Research, Vol. 91, pp. 305-318, 1999
doi: 10.1023/A:1018910109348 |
[2] | R.F. Yang and J. S. Kang, “Joint Optimization for Inspection and Replacement Model based on a Three-Stage Failure Process,” International Journal of System Assurance Engineering & Management, No. 8,pp. S118-S128, 2017 |
[3] |
W. Wang , “A Stochastic Model for Joint Spare Parts Inventory and Planned Maintenance Optimization,” European Journal of Operational Research, Vol. 216, No. 1, pp. 127-139, 2012
doi: 10.1016/j.ejor.2011.07.031 |
[4] |
W. Wang and D. Banjevic, “Ergodicity of Forward Times of the Renewal Process in a Block-based Inspection Model Using the Delay Time Concept,” Reliability Engineering & System Safety, Vol. 100, pp. 1-7, 2012
doi: 10.1016/j.ress.2011.12.011 |
[5] | T. Nakagawa , “Imperfect Preventive-Maintenance,” IEEE Transactions on Reliability, Vol. 28, No. 5, pp. 402-402, 1979 |
[6] |
Z.B. Shan and H. F. Wang ., “Multi-Objective Decision making Model for Distribution System Condition-based Maintenance,” in Proceedings of China International Conference on Electricity Distribution, IEEE, 2016
doi: 10.1109/CICED.2016.7576042 |
[7] |
X.F. Li, R. Y. He, Z. W. Yan , “A New Imperfect Maintenance Model based on Delay-Time Concepts for Single Components with Multiple Failure Modes,” International Journal of System Assurance Engineering & Management, Vol.6, No. 4, pp. 479-486, 2015
doi: 10.1007/s13198-014-0306-6 |
[8] |
Y. Dijoux and O. Gaudoin, “Generalized Random Sign and Alert Delay Models for Imperfect Maintenance,” Lifetime Data Analysis, Vol. 20, pp. 185-209, 2014
doi: 10.1007/s10985-013-9249-5 pmid: 23460491 |
[9] |
A. Gouiaa-Mtibaa, S. Dellagi, Z. Achour, W. Erray , “Integrated Maintenance-Quality Policy with Rework Process under Improved Imperfect Preventive Maintenance,” Reliability Engineering and System Safety, Vol. 173, pp. 1-11, 2018
doi: 10.1016/j.ress.2017.12.020 |
[10] |
S. Mercier and I. T. Castro, “Stochastic Comparisons of Imperfect Maintenance Models for a Gamma Deteriorating System,” European Journal of Operational Research, Vol. 273, No. 1, pp. 237-248, 2019
doi: 10.1016/j.ejor.2018.06.020 |
[11] |
R. F. Yang, Z. W. Yan, J. S. Kang , “An Inspection Maintenance Model based on a Three-stage Failure Process with Imperfect Maintenance via Monte Carlo Simulation,” International Journal of System Assurance Engineering & Management, Vol.6, No. 3, pp. 231-237, 2015
doi: 10.1007/s13198-014-0292-8 |
[12] | E. M. P. Hidalgo and G.F.M. Souza. , “A Multi-Criteria Decision Model to Determine Intervals of Preventive Maintenance with Equipment Reliability Degradation Due to Imperfect Maintenance,” CRC Press-Taylor & Francis Group, 2014 |
[13] |
A. Sanchez and S. D. Carlos, “Addressing Imperfect Maintenance Modelling Uncertainty in Unavailability and Cost based Optimization,” Reliability Engineering & System Safety, Vol. 94, pp. 22-32, 2009
doi: 10.1016/j.ress.2007.03.022 |
[14] | R.L. Keeney and H. Raiffa , “Decisions with Multiple Objectives: Preferences and Value Trade-offs,” Cambridge university press, Cambridge, 1993 |
[15] |
A. T. Almeida , “Multicriteria Model for Selection of Preventive Maintenance Intervals,” Quality & Reliability Engineering International,Vol. 28, pp. 585-593, 2012
doi: 10.1002/qre.1415 |
[16] |
A. H.S. Garmabaki, A. Ahmadi, and M. Ahmadi, “Maintenance Optimization Using Multi-Attribute Utility Theory,” Current Trends in Reliability, Availability, Maintainability and Safety, Lecture Notes in Mechanical Engineering, Springer, Cham, pp. 13-37, 2016
doi: 10.1007/978-3-319-23597-4_2 |
[17] |
H. Wang and H. Pham, “Optimal Preparedness Maintenance of Multi-Unit Systems with Imperfect Maintenance and Economic Dependence,” Reliability and Optimal Maintenance, pp. 135-150, 2006
doi: 10.1142/9789812811868_0006 |
[18] |
S. J.T. Jansen, “The Multi-Attribute Utility Method,” Measurement & Analysis of Housing Preference & Choice, pp. 101-125, 2011
doi: 10.1007/978-90-481-8894-9_5 |
[1] | Zhiyang Zhang, Yonghua Li, Dongxu Zhang, Yuhan Tang, and Qing Xia. Reliability Evaluation of Flat Car Underframe based on GSA-BP Neural Network and Probability Box [J]. Int J Performability Eng, 2024, 20(6): 400-411. |
[2] | Ayushi Sharma and Kavita Pandey. MARR_VDS: A New Scheduling Approach for Energy & Cost Efficiency in VANET [J]. Int J Performability Eng, 2024, 20(5): 292-299. |
[3] | Kangjun Xu, Yonghua Li, Qi Gong, Dongxu Zhang, and Tao Guo. A Novel Fatigue Reliability Calculation Method Based on INGO-BPNN [J]. Int J Performability Eng, 2024, 20(5): 319-332. |
[4] | Darius Muyizere, Arcade Nshimiyimana, Theophile Mugerwa, Lawrence K. Letting, and Bernard B. Munyazikwiye. Reliability Assessment of Distribution System Grid-Connected Multi-Inverter for Solar Photo-Voltaic Systems: A Case Study [J]. Int J Performability Eng, 2024, 20(3): 149-156. |
[5] | Amit Kumar Singh and P. C. Tewari. An Overview of Reliability, Availability, Maintainability, and Safety Strategies for Complex Systems in Various Process Industries [J]. Int J Performability Eng, 2023, 19(12): 788-796. |
[6] | Yonghua Li, Shujian Liu, Xiaoning Bai, and Yufeng Wang. An Interval-Probability Hybrid Structural Reliability Calculation Method Based on CSSA-BR-BP [J]. Int J Performability Eng, 2023, 19(10): 687-699. |
[7] | Jinxin Wang, Zhiping Zhai, Yuezheng Lan, Xiaoyi Zhai, and Lixiang Zhao. Reliability Analysis and Optimization of Forage Crushers Based on Bayesian Network [J]. Int J Performability Eng, 2023, 19(10): 700-709. |
[8] | Punj Lata Singh, Sharad Singh Malik, Bhanu Pratap Singh Gupta, Piyush Pahadia, and Rahul Sindhwani. Assessment and Performability of Green and Conventional Building: Time and Cost Analysis [J]. Int J Performability Eng, 2022, 18(6): 387-395. |
[9] | Yu-Lun Chao, Yi-Kuei Lin, and Cheng-Ta Yeh. AMC-Based Algorithm for Network Reliability Evaluation of a Manufacturing System with Scrapping and Rework [J]. Int J Performability Eng, 2022, 18(4): 231-240. |
[10] | Madhumitha J, and G. Vijayalakshmi. Multi-State Performance Analysis of Linear Consecutive 2-out-of-4: F System using Markov Reward Model [J]. Int J Performability Eng, 2022, 18(12): 903-910. |
[11] | Risu Na, Weiguo Zhang, Kaifa Jia, and Quan Zhang. Key Factors of Seal Ring Reliability based on QFD [J]. Int J Performability Eng, 2022, 18(11): 759-769. |
[12] | Tae-Jin Yang. Comparative Analysis on the Reliability Performance of NHPP Software Reliability Model Applying Exponential-Type Lifetime Distribution [J]. Int J Performability Eng, 2022, 18(10): 679-689. |
[13] | Ruiqi Wang, Guangyu Chen, Na Liang, Zheng Huang. Preventive Maintenance Optimization Regarding Large-Scale Systems based on the Life-Cycle Cost [J]. Int J Performability Eng, 2021, 17(9): 766-778. |
[14] | Surbhi Gupta, H.D. Aroraa, Anjali Naithania, Anil Chandrab. Reliability Assessment of the Planning and Perception Software Competencies of Self-Driving Cars [J]. Int J Performability Eng, 2021, 17(9): 779-786. |
[15] | Tyler D. Ridder and Ram M. Narayanan. Radar Detection Performability under Graceful Degradation [J]. Int J Performability Eng, 2021, 17(8): 666-675. |
|