Reliability Analysis of Identical Two-Unit Parallel CC Plant System Operative with Full Installed Capacity
A. G. MATHEW, S. M. RIZWAN, M. C. MAJUMDER, K. P. RAMACHANDRAN, and G. TANEJA
Int J Performability Eng . 2011, (2): 179 -187 .  DOI: 10.23940/ijpe.11.2.p179.mag