Production Rate Maximization of a Multi-State System under Inspection and Repair Policy
ISAAC WASSY SORO, DAOUD AÏT-KADI, and MUSTAPHA NOURELFATH
Int J Performability Eng . 2012, (4): 409 -416 .  DOI: 10.23940/ijpe.12.4.p409.mag