Int J Performability Eng ›› 2015, Vol. 11 ›› Issue (1): 91-96.doi: 10.23940/ijpe.15.1.p91.mag
• Original articles • Previous Articles
XUEJUAN LIU, WENBIN WANG, FEI ZHAO, and RUI PENG
Abstract:
This paper considers a production system producing multiple products alternately, and a production cycle is formed by a complete run of all products which go through the system in sequence. Two different preventive maintenance policies are studied. A framework is proposed to solve the optimal lot-size of each product together with the optimal preventive maintenance epoch which minimizes the system’s cost rate in long run.
XUEJUAN LIU, WENBIN WANG, FEI ZHAO, and RUI PENG. Joint Lot-size and Preventive Maintenance Optimization for a Production System [J]. Int J Performability Eng, 2015, 11(1): 91-96.
Add to citation manager EndNote|Reference Manager|ProCite|BibTeX|RefWorks
/ / Recommend
URL: https://www.ijpe-online.com/EN/10.23940/ijpe.15.1.p91.mag
https://www.ijpe-online.com/EN/Y2015/V11/I1/91