Int J Performability Eng ›› 2017, Vol. 13 ›› Issue (1): 63-72.doi: 10.23940/ijpe.17.01.p5.6372

• Original articles • Previous Articles     Next Articles

Stochastic and Cost-Benefit Analysis of Two Unit Hot Standby Database System

Amit Manocha1, Gulshan Taneja2, and Sukhvir Singh3   

  1. 1Department of Mathematics, T.I.T. S., Bhiwani, Haryana, India2 Department of Mathematics, M.D. University Rohtak, Haryana, India3Department of Computer Science, N.C.C.E. Panipat, Haryana, India

Abstract:

A discrete state space and continuous time stochastic model for two unit hot standby database system has been developed. The system comprised of one primary unit and single hot standby unit. The primary unit is production unit synchronized with hot standby unit through online transfer of archive redo log files. Different modes of failure of primary database unit are considered. Failure of database unit either primary or standby is dealt by database administrator (DBA). Expressions for various measures of system effectiveness have been obtained by making use of semi-Markov processes and regenerative point technique. Numerical results have been drawn on the basis of data collected. Bounds pertaining the profitability of the system have also been obtained.


Received on October 08, 2016, revised on November 30, 2016
References: 10