|
|
|
Application of PAA in EPR Nuclear Power Units
|
|
Chen Wen,Wang Zhiwu,Qing Chen,Chen Shijun,Chen Jiefei,Chen Yu,Jiang Hong,Zhang Tao
|
|
| |
Table7 Probabilistic availability assessment result
|
|
| PAA summary | Failure mode | Failure rate | Unit | Time(hours/year) | UU type | Shutdown overhaul time(h) | Forced shutdown overhaul time h (line) | Plant forced shutdown overhaul time (h/year) | | VVP | refuse to close | 0.00031 | time | 12 | 3a | 62 | 0.2306 | 0.6918 | | close by mistake | 0.0000019 | h | 7884 | 1a | 14 | 0.2097 | 0.6291 | | ARE | fail to regulate | 0.0000028 | h | 8760 | 1a | 17 | 0.3753 | 1.1259 | | refuse to close | 0.0003 | time | 6 | 3a | 62 | 0.1116 | 0.3348 | | close by mistake | 0.000000308 | h | 8760 | 1a | 17 | 0.0402 | 0.1206 | | Totalamount of single reactor (h/year): | 2.902 |
|
|
|