Username   Password       Forgot your password?  Forgot your username? 

 

Method for Equipment Support Facility Location According to the Prescription Mission Conditions

Volume 15, Number 5, May 2019, pp. 1371-1380
DOI: 10.23940/ijpe.19.05.p13.13711380

Shixin Zhang, Xiang Zan, Chunliang Chen, Weilong Chen, and Tonghan Wu

Department of Technical Support Engineering, Academy of Army Armored Force of China, Beijing, 100072, China

(Submitted on December 16, 2018; Revised on January 12, 2019; Accepted on February 10, 2019)

Abstract:

For the facility location problem of operations equipment support, a locating decision-making model of operations equipment support is proposed. The model decision-making target model is the minimum support-delayed time of the equipment system, and influence factors are considered including the operational task facility effect on repair capabilities of facility location, equipment technical faults, and battle damage. A two-phase heuristics algorithm using location and decision-service-relation, neighborhood search, and genetic algorithm are used. The decision-making target is acquired through Monte Carlo simulation. An example is used to verify the models and the effectuality of the algorithm, and it is demonstrated that the mission conditions have a significant influence on the operations equipment support facility location.

 

References: 10

    1. G. D. Yu and C. L. Huang, “Science of Operations Equipment Support,” National University of Defense Press, Beijing, 2002
    2. G. Guastaroba and M. G. Speranza, “Kernel Search for the Capacitated Facility Location Problem,” Journal of Heuristics, Vol. 129, No. 2, pp. 877-917, 2012
    3. S. Gollowitzer, B. Gendron, and I. Ljubi´c, “A Cutting Plane Algorithm for the Capacitated Connected Facility Location Problem,” Computational Optimization and Applications, Vol. 55, No. 3, pp. 647-674, 2013
    4. W. F. Wang, Y. J. Liu, and B. Guo, “Research on the Armaments Repair Support Network Design Problem,” Acta Armamentarii, Vol. 29, No. 12, pp. 1501-1508, 2008
    5. J. G. Kim, H. B. Jun, and C. M. Kim, “A Two-Phase Heuristic Algorithm for the Fixed-Charge Capacitated Network Design Problem with Turn Penalties,” KSCE Journal of Civil Engineering, Vol. 15, No. 6, pp. 1125-1132, 2011
    6. H. Xu and C. L. Chen, “Equipment Efficient Support Generality,” National Defend Industry Press, Beijing, 2012
    7. C. B. Li and Z. F. M hang, “Reverse Logistics Network Optimization of Integrated Location-Routing-Inventory Problem,” Computer Integrated Manufacturing Systems, Vol. 20, No. 7, pp. 1793-1798, 2014
    8. B. H. Zhao, “Research on Cloud Computing Task Scheduling Method based on Hybrid Algorithm,” Modern Electronics Technique, Vol. 39, No. 12, pp. 70-72, 2016
    9. J. X. Du, C. S. Chen, J. F. Tong, and J. L. Wu, “Research on Maintain Task Scheduling of Armored Equipment Support based on Queuing Theory,” Computing Simulation, Vol. 33, No. 2, pp. 340-343, 2016
    10. J. Y. Yan, “Task Scheduling Research and Simulation of Path Selection Method,” Computing Simulation, Vol. 33, No. 6, pp. 47-51, 2016

     

    Please note : You will need Adobe Acrobat viewer to view the full articles.Get Free Adobe Reader

     
    This site uses encryption for transmitting your passwords. ratmilwebsolutions.com