Back to Short Communications
Control Charts with Runs Rules for Poisson Process Data
SC IJPE 47
Justin R Chimka and Heng Du
Department of Industrial Engineering, University of Arkansas, Fayetteville, AR 72701, U.S.A.
(Received on April 7, 2014; revised on June 20, 2014)
Abstract:
We use Markov chains to compare run lengths of Poisson process individuals control charts with and without runs rules. Evidence quantifies the advantage of runs rules for certain cost structures z = Ca / Cb, where Ca is the cost of a Type I error, and Cb is the cost of a Type II error, and different shifts from in-control parameter l1 to out-of-control parameter l2.
Status: Published in the September 2014 issue
|