Application of PAA in EPR Nuclear Power Units
Chen Wen,Wang Zhiwu,Qing Chen,Chen Shijun,Chen Jiefei,Chen Yu,Jiang Hong,Zhang Tao
Table6 TUjkCalculation methods of different unavailabilitytypes[7]
No. Unavailability type Failure unavailability time Failure unavailability probabilistic
1 Category: direct shutdown 1a: automated shutdown TUjk = t100→0%PNshutdown+ tcondition+ tpreparation+ MTTR+ tre-identification+ treach100%PN Xjk = λjk × TUjk
1b: hand-operated shutdown TUjk = t100→0%PNhand-operated+ tcondition+ tpreparation+ MTTR + tre-identification+ treach100%PN
1c: hand-operated shutdown after power reduction TUjk = α·tdiagnosis+ t100→0%PNnormal+ tcondition+ tpreparation+ MTTR + t re-identification + treach100%PN
2 Second category: power reduction 2a: maintenance during power reduction TUjk = α·(MTTR + tre-identification)
2b: power reduction to next shutdown TUjk =α·t diagnosis +t100→0%PNnormal+ tcondition + tpreparation+MTTR + t re-identification +treach100%PN
3 Third category: OTS requirements 3a: failures that cannot be repaired in RP mode of operational equipment TUjk = t100→0%PNnormal+ tcondition+ tpreparation+ MTTR + tre-identification+ treach100%PN
3b: stand-by component failure TUjk = 1t100→0%PNnormal + tcondition + MTTRi + tre-identification + treach100%PN