Heuristic for Hot-Rolled Batch Scheduling of Seamless Steel Tubes with Machine Maintenance and Tardiness
Yang Wang, Tieke Li, and Bailin Wang
Int J Performability Eng . 2019, (7): 1849 -1859 .  DOI: 10.23940/ijpe.19.07.p11.18491859