Bilevel-Programming Based Time-Censored Ramp-Stress ALTSP with Warranty Cost
PREETI WANTI SRIVASTAVA DEEPMALA SHARMA
Int J Performability Eng . 2014, (3): 281 -290 .  DOI: 10.23940/ijpe.14.3.p281.mag