Reliability Analysis of a Seven Unit Desalination Plant with Shutdown during Winter Season and Repair/Maintenance on FCFS Basis
VIZS. M. RIZWAN, N. PADMAVATHI, ANITA PAL, and G. TANEJA
Int J Performability Eng . 2013, (5): 523 -528 .  DOI: 10.23940/ijpe.13.5.p523.mag