TY - Int J Performability Eng A1 - Haodong Zhu, Baofeng He, and Hongchan Li T1 - Modified Bat Algorithm for the Multi-Objective Flexible Job Shop Scheduling Problem Y1 - 2017-11-01 JF - International Journal of Performability Engineering JO - Int J Performability Eng SP - 999 EP - 1012 VL - 13 IS - 7 UR - https://www.ijpe-online.com N1 - 10.23940/ijpe.17.07.p1.9991012 ER -