TY - Int J Performability Eng A1 - KEVIN COYNE ALI MOSLEH T1 - Nuclear Plant Control Room Operator Modeling Within the ADS-IDAC, Version 2, Dynamic PRA Environment: Part 1 - General Description and Cognitive Foundations Y1 - 2014-11-01 JF - International Journal of Performability Engineering JO - Int J Performability Eng SP - 691 EP - 703 VL - 10 IS - 7 UR - https://www.ijpe-online.com N1 - 10.23940/ijpe.14.7.p691.mag ER -