[1] Q. Dang, “Designed on Operation and Management System for Aerospace TT&C Station,” inProceedings of the 28th Conference of Spacecraft TT&C Technology in China, pp. 579-590, 2016 [2] J. Liu, “Spacecraft TT&C and Communication Engineering,” National Defense Industry Press, 2010 [3] K. M. Aron, G. Fox,D. H. Ebbeler, “Reliability Modeling for the Space Interferometry Mission,” inProceedings of IEEE Aerospace Conference, Vol. 2, pp. 689-704, 2002 [4] F. Hamed and S. T. A. Niaki, “Fault Tree Analysis for Reliability Evaluation of an Advanced Complex Manufacturing System,” Journal of Advanced Manufacturing Systems, Vol. 17, No. 1, pp. 107-118, 2018 [5] L. Anatoly, “A Multi-State Markov Model for a Short-Term Reliability Analysis of a Power Generating Unit,” Reliability Engineering & System Safety, Vol. 98, No. 1, pp. 1-6, 2017 [6] H. Xie, E. Gong,Y. He, “Study on Reliability of Phased Missions System with Time-Varying Structure,” Journal of National University of Defense Technology, Vol. 21, No. 5, pp. 41-45, 1999 [7] X. Wu, G. Wang,L. Lu, “An Approach to Mission Reliability Analysis of Spaceflight TT&C System,” inProceedings of the 4th Asia-Pacific International Symposium on Advanced Reliability Modeling, pp. 748-755, 2010 [8] X. Yang and X. Wu, “Mission Reliability Assessment of Space TT&C System by Discrete Event System Simulation,” Quality & Reliability Engineering International, Vol. 30, No. 8, pp. 1263-1273, 2015 [9] S. Xu, “A Simulation Method for Space TT&C Communication System Mission Reliability Evaluation,” ‘National University of Defense Technology, 2013 [10] X. Wu and J. Hillston, “Monte Carlo Simulation for Reliability Estimation of Phased-Mission Systems With Minimum Operational Time Requirement,” in Proceedings of the 6th International Conference on Quality, Reliability, Risk, Maintenance, and Safety Engineering, Jiuzhaigou, China, July 2016 [11] J. Xiong, R. Leus,Z. Yang, “Evolutionary Multi-Objective Resource Allocation and Scheduling in the Chinese Navigation Satellite System Project,” European Journal of Operational Research, Vol. 251, No. 2, pp. 662-675, 2016 [12] W. Herroelen and R. Leus, “Project Scheduling under Uncertainty: Survey and Research Potentials,” European Journal of Operational Research, Vol. 165, No. 2, pp. 289-306, 2005 |