[1] M. Kim, S. Ji,H. Jun, “BIM-based File Synchronization and Permission Management System for Architectural Design Collaboration,” Journal of Asian Architecture & Building Engineering, Vol. 16, No. 3, pp. 511-518, September 2017 [2] K. Rutten, J. De Baerdemaeker, J. Stoev, M. Witters,B. De Ketelaere, “Constrained Online Optimization Using Evolutionary Operation: A Case Study About Energy‐Optimal Robot Control,” Quality & Reliability Engineering International, Vol. 31, No. 6, pp. 1079-1088, June 2015 [3] Y. Mo, X. Chen,Y. Ou, “Study on Network Assisted the Teaching of Histology and Embryology,”China Higher Medical Education, No. 5, pp. 11-12, 2012 [4] Y. Lin, C. Wang, C. Ma, Z. Dou,X. Ma, “A New Combination Method for Multisensor Conflict Information,” Journal of Supercomputing, Vol. 72, No. 7, pp. 2874-2890, July 2016 [5] A. Malathi and B. S. Santhosh, “An Enhanced Algorithm to Predict a Future Crime Using Data Mining,” International Journal of Computer Applications, Vol. 21, No. 1, pp. 1-6, May 2011 [6] H. W. Jeon, K. H. Choi, S. J. Lee,S. J. Park, “Development of BIM based BIPV Architectural Design Environment,” Kieae Journal, Vol. 18, No. 1, pp. 71-82, February 2018 [7] G. Helmer, J. S. K.Wong, V. G. Honavar, L. Miller, and Y. Wang, “Lightweight Agents for Intrusion Detection,” Journal of Systems and Software, Vol. 67, No. 2, pp. 109-122, August 2003 [8] Y. T.Gokuc and D. Arditi, “Adoption of BIM in Architectural Design Firms,” Architectural Science Review, Vol. 60, No. 6, pp. 483-492, October 2017 [9] H. Li, “51 Research on the Application of Microteaching Method in the Collective Course Teaching of Chorus Conducting in Universities,” Revista de la Facultad de Ingeniería, Vol. 32, No. 9, pp. 360-364, 2017 [10] Y. Zou, S. W. Jones,A. Kiviniemi, “Developing a Tailored RBS Linking to BIM for Risk Management of Bridge Projects,” Engineering Construction & Architectural Management, Vol. 23, No. 6, pp. 727-750, October 2016 [11] M. L. Othman, I. Aris, M. R. Othman,H. Osman, “Rough-Set-and-Genetic-Algorithm based Data Mining and Rule Quality Measure to Hypothesize Distance Protective Relay Operation Characteristics from Relay Event Report,” International Journal of Electrical Power & Energy Systems, Vol. 33, No. 8, pp. 1437-1456, October 2011 [12] M. J. Huang, M. Y. Chen,H. S. Huang, “Constructing a Personalized E-Learning System based on Genetic Algorithm and Case-based Reasoning Approach,” Expert Systems with Applications, Vol. 33, No. 3, pp. 551-564, October 2007 [13] K. H.Raviya and B. Gajjar, “Performance Evaluation of Different Data Mining Classification Algorithm Using WEKA,” Indian Journal of Research, Vol. 2, No. 1, pp. 19-21, January 2013 [14] D. Miller, “Putting BIM at the Heart of a Small Practice,” Architectural Design, Vol. 87, No. 3, pp. 42-47, June 2017 [15] E. W.Sun and T. Meinl, “A New Wavelet-based Denoising Algorithm for High-Frequency Financial Data Mining,” European Journal of Operational Research, Vol. 217, No. 3, pp. 589-599, March 2012 [16] S. J. Woo, “Developing a Prototype of Green BIM -based Integrated Design Systems for Small Architectural Design Firms,” International Journal of Contents, Vol. 12, No. 1, pp. 6-13, March 2016 [17] J. H. Shin, J. S. Choi,I. H. Kim, “Development of IT BSC-based Assessment System to Measure BIM Performance for Architectural Design Firms,” Journal of the Architectural Institute of Korea Planning & Design, Vol. 32, No. 1, pp. 3-12, January 2016 [18] Q. Wu, Y. Li,Y. Lin, “The Application of Nonlocal Total Variation in Image Denoising for Mobile Transmission,” Multimedia Tools & Applications, Vol. 76, No. 16, pp. 1-13. August 2016 [19] X. Wei, “68 Strategy and Path Analysis of Choral Command Teaching in Colleges and Universities,” Boletín Técnico, Vol. 55, No. 19, pp. 466-470, 2017 [20] J. Son and J. Ock, “A Study on Measurement Method of BIM ROI in Architectural Design Firm,” Korean Journal of Computational Design & Engineering, Vol. 21, No. 3, pp. 267-280, 2016 |