|
A. Bagheri, M. Zandieh, I. Mahdavi, M. Yazdani, “An artificial immune algorithm for the flexible job-shop scheduling problem,” Future Generation Computer Systems, vol. 26, no. 4, pp. 533-541, 2010.
|
|
P. Brandimarte, “Routing and scheduling in a flexible job shop by tabu search,” Annals of Operations Research, vol. 41, no. 3, pp. 157-183, 1993.
|
|
K. Z. Gao, P. N. Suganthan, Q. K. Pan, “Pareto-based grouping discrete harmony search algorithm for multi-objective flexible job shop scheduling,” Information Sciences, vol. 289, no. 7, pp. 76-90, 2014.
|
|
A. H. Gandomi, X. S. Yang, A. H. Alavi, S. Talatahari, “Bat algorithm for constrained optimization tasks,” Neural Computing and Applications, vol. 22, no. 6, pp. 1239-1255, 2013.
|
|
A. Henchiri, M. Enngirou, “Particle swarm optimization combined with tabu search in a multi-agent model for flexible job shop problem,” Computer Science, vol. 7929, no. 1, pp. 385-394, 2013.
|
|
I. Kacem, S. Hammadi, P. Borne, “Approach by localization and multi-objective evolutionary optimization for flexible job-shop scheduling problems,” IEEE Transactions on Systems, Man, and Cybernetics, Part C: Applications and Reviews, vol. 32, no. 1, pp. 1-13, 2002.
|
|
I. Kacem, S. Hammadi, P. Borne, “Pareto-optimality approach for flexible job-shop scheduling problems: hybridization of evolutionary algorithms and fuzzy logic,” Mathematics and Computers in Simulation, vol. 60, no. 3, pp. 245-276, 2012.
|
|
V. Kaplano?lu, “An object-oriented approach for multi-objective flexible job-shop scheduling problem,” Expert Systems with Applications, vol. 45, no. 7, pp. 71-84, 2016.
|
|
J. Li, Q. Pan, Y. C. Liang, “An effective hybrid tabu search algorithm for multi-objective flexible job-shop scheduling problems,” Computers & Industrial Engineering, vol. 59, no. 4, pp. 647-662, 2010.
|
|
J. Q. Li, Q. K. Pan, M. F. Tasgetiren, “A discrete artificial bee colony algorithm for the multi-objective flexible job-shop scheduling problem with maintenance activities,” Applied Mathematical Modelling, vol. 38, no. 3, pp. 1111-1132, 2014.
|
|
Q. Luo, Y. Zhou, J. Xie, et al, “Discrete bat Algorithm for optimal problem of permutation flow shop scheduling,” The Scientific World Journal, vol. 25, no. 1, pp. 1-25, 2014.
|
|
M. K. Marichelvam, T. Prabaharam, “A bat algorithm for realistic hybrid flowshop scheduling problems to minimize makespan and mean flow time,” ICTACT Journal on Soft Computing, vol. 3, no. 1, pp. 428-433, 2012.
|
|
M. K. Marichelvam, T. Prabaharan, X. S. Yang, et al, “Solving hybrid flow shop scheduling problems using bat algorithm,” International Journal of Logistics Economics and Globalisation, vol. 5, no. 1, pp. 15-29, 2013.
|
|
G. Moslehi, M. Mahnam, “A Pareto approach to multi-objective flexible job-shop scheduling problem using particle swarm optimization and local search,” International Journal of Production Economics, vol. 129, no. 1, pp. 14-22, 2011.
|
|
S. H. A. Rahmati, M. Zandieh, “A new biogeography-based optimization (BBO) algorithm for the flexible job shop scheduling problem,” The International Journal of Advanced Manufacturing Technology, vol. 58, no. 12, pp. 1115-1129, 2012.
|
|
B. Ramesh, V. C. J. Mohan, V. C. V. Reddy, “Application of bat algorithm for combined economic load and emission dispatch,” International Journal of Electricl Engineering and Telecommunications, vol. 2, no. 1, pp. 1-9, 2013.
|
|
M. Saidi-Mehrabad, P. Fattahi, “Flexible job shop scheduling with tabu search algorithms,” The International Journal of Advanced Manufacturing Technology, vol. 32, no. 6, pp. 563-570, 2007.
|
|
N. Shivasankaran, P. S. Kumar, K. V. Raja, “Hybrid sorting immune simulated annealing algorithm for flexible Job shop scheduling,” International Journal of Computational Intelligence Systems, vol. 8, no. 3, pp. 455-466, 2015.
|
|
?. Tosun, M. K. Marichelvam, “Hybrid bat algorithm for flow shop scheduling problems,” International Journal of Mathematics in Operational Research, vol. 9, no. 1, pp. 125-138, 2016.
|
|
L. Wang, G. Zhou, Y. Xu, S. Wang, “An effective artificial bee colony algorithm for the flexible job-shop scheduling problem,” The International Journal of Advanced Manufacturing Technology, vol. 60, no. 4, pp. 303-315, 2012.
|
|
S. Wang, C. Liu, D. Pei, J. Wang, “A novel hybrid election campaign optimisation algorithm for multi-objective flexible job-shop scheduling problem,” International Journal of Materials and Structural Integrity, vol. 7, no. 1, pp. 160-170, 2013.
|
|
W. Xia, Z. Wu, “An effective hybrid optimization approach for multi-objective flexible job-shop scheduling problems,” Computers & Industrial Engineering, vol. 48, no. 2, pp. 409-425, 2005.
|
|
M. Yazdani, M. Amiri, M. Zandieh, “Flexible job-shop scheduling with parallel variable neighborhood search algorithm,” Expert Systems with Applications, vol. 37, no. 1, pp. 678-687, 2010.
|
|
X. S. Yang, “A new metaheuristic bat-inspired algorithm,” Springer Berlin Heidelberg, Germany,2010.
|
|
X. S. Yang, “Bat algorithm for multi-objective optimization,” International Journal of Bio-Inspired Computation, vol. 3, no. 5, pp. 267-274, 2011.
|
|
Y. Yuan, H. Xu, J. Yang, “A hybrid harmony search algorithm for the flexible job shop scheduling problem,” Applied Soft Computing, vol. 13, no. 7, pp. 3259-3272, 2013.
|
|
G. Zhang, L. Gao, Y. Shi, “An effective genetic algorithm for the flexible job-shop scheduling problem,” Expert Systems with Applications, vol. 38, no. 4, pp. 3563-3573, 2011.
|