Int J Performability Eng ›› 2011, Vol. 7 ›› Issue (2): 179-187.doi: 10.23940/ijpe.11.2.p179.mag

• Original articles • Previous Articles     Next Articles

Reliability Analysis of Identical Two-Unit Parallel CC Plant System Operative with Full Installed Capacity

A. G. MATHEW1, S. M. RIZWAN2, M. C. MAJUMDER3, K. P. RAMACHANDRAN4, and G. TANEJA5   

  1. 1, 4 Department of Mechanical and Industrial Engineering, Caledonian College of Engineering, Oman
    2 Department of Mathematics and Statistics, Caledonian College of Engineering, Oman
    3 Department of Mechanical Engineering, National Institute of Technology, Durgapur, India
    5 Department of Statistics, MD University, Rohtak, India

Abstract:

The paper presents a reliability analysis of an identical two-unit parallel CC plant system. Each unit consists of two identical 150 ton electrically operated overhead travelling (EOT) cranes operative at fully installed capacity. Failure in any crane of a unit brings the unit to a complete halt, and the inspection is carried out to detect the type of failure. Four years maintenance data from a steel production plant have been used for this purpose. Three major failures were noted in the system, viz., repairable, replaceable, and reconditioning/reinstallation. The real failure situations as depicted in the data have been considered for analysis. Optimized reliability indices of the system effectiveness are estimated numerically by using semi-Markov processes and regenerative point techniques.
Received on September 13, 2009, revised on September 12, 2010
References: 3