[1] C. Y.Lee and S. D. Liman, “Single Machine Flow-Time Scheduling with Scheduled Maintenance,” Acta Informatica, Vol. 29, No. 4, pp. 375-382, 1992 [2] V. Nesello, A. Subramanian, M. Battarra,G. Laporte, “Exact Solution of the Single-Machine Scheduling Problem with Periodic Maintenances and Sequence-Dependent Setup Times,” European Journal of Operational Research, Vol. 266, No. 2, pp. 498-507, 2018 [3] F. ángel-Bello, A. Alvarez, J. A. Pacheco,I. Martínez-Salazar, “A Heuristic Approach for a Scheduling Problem with Periodic Maintenance and Sequence-Dependent Setup Times,” Computers & Mathematics with Applications, Vol. 61, No. 4, pp. 797-808, 2011 [4] Z. X. Wu, T. K. Li, W. X. Zhang,B. L. Wang, “Methods of Hot-Rolled Batch Planning for Seamless Steel Tube with Machine Maintenance,” Control Theory & Applications, Vol. 9, pp. 1250-1259, 2017 [5] J. Pacheco, S. Porras, S. Casado,B. Baruque, “Variable Neighborhood Search with Memory for a Single-Machine Scheduling Problem with Periodic Maintenance and Sequence-Dependent Set-up Times,” Knowledge-based Systems, Vol. 145, pp. 236-249, 2018 [6] J. Pacheco, F. ángel-Bello,A. Álvarez, “A Multi-Start Tabu Search Method for a Single-Machine Scheduling Problem with Periodic Maintenance and Sequence-Dependent Set-up Times,” Journal of Scheduling, Vol. 16, No. 6, pp. 661-673, 2013 [7] Y. Q. Yin, J. Y. Xu, T. C. E.Cheng, and C. C. Wu, “Approximation Schemes for Single-Machine Scheduling with a Fixed Maintenance Activity to Minimize the Total Amount of Late Work,” Naval Research Logistics, Vol. 63, No. 2, pp. 172-183, 2016 [8] B. Rachid, H. Allaoui, A. Artiba,S. Hanafi, “Minimizing the Weighted Sum of Maximum Earliness and Maximum Tardiness Costs on a Single Machine with Periodic Preventive Maintenance,”Computers & Operations Research, Vol. 47, pp. 106-113, 2014 [9] J. Y.Lee and Y. D. Kim, “Minimizing the Number of Tardiness Jobs in a Single-Machine Scheduling Problem with Periodic Maintenance,” Computers & Operations Research, Vol. 39, No. 9, pp. 2196-2205, 2012 [10] M. Sbihi and C. Varnier, “Single-Machine Scheduling with Periodic and Flexible Periodic Maintenance to Minimize Maximum Tardiness,” Computers & Industrial Engineering, Vol. 55, No. 4, pp. 830-840, 2008 [11] J. X. Luo, H. M. Liu,Y. M. Hu, “IFF Algorithm for the Single Machine Total Weighted Tardiness Scheduling Problem with Sequence Dependent Setup Times,” System Engineering- Theory & Practice, Vol. 32, No. 12, pp. 2802-2808, 2012 [12] H. Xu, Z. Lü,T. C. Cheng, “Iterated Local Search for Single-Machine Scheduling with Sequence-Dependent Setup Times to Minimize Total Weighted Tardiness,” Journal of Scheduling, Vol. 17, No. 3, pp. 271-287, 2014 [13] Q. Guo and L. Tang, “An Improved Scatter Search Algorithm for the Single Machine Total Weighted Tardiness Scheduling Problem with Sequence-Dependent Setup Times,”Applied Soft Computing, Vol. 29, pp. 184-195, 2015 [14] A. Subramanian and K. Farias, “Efficient Local Search Limitation Strategy for Single Machine Total Weighted Tardiness Scheduling with Sequence-Dependent Setup Times,”Computers & Operations Research, Vol. 79, pp. 190-206, 2017 [15] K. Deb, A. Pratap, S. Agarwal,T. Meyarivan,“A Fast and Elitist Multi Objective Genetic Algorithm: NSGA-II,” IEEE Transactions on Evolutionary Computation, Vol. 6, No. 2, pp. 182-197, 2002 |