1 |
T. L. Song, Y. L. Wang, Y. Fang, “General Philosophy Support for Materiel Development, ” National Defense Industry Press, Beijing, 2014
|
2 |
W. K. Liu, H. Wang, K. Y. Wang, “Operational Readiness Evaluation of Equipment in US Army and Inspirations,”Journal of Military Transportation University, Vol. 19, No. 11, pp.25-29, November 2017
|
3 |
Y. S. Liand H. P. Shi, “Military Equipment Operational Readiness and Analysis on Affecting Factors,”Electronic Product Reliability and Environmental Testing, Vol. 25, No. 1, pp.38-41, February 2007
|
4 |
M. B. Rodrigues, M. Karpowicz, K. Kang, “A Readiness Analysis for the Argentine Air Force and the Brazilian Navy A-4 Fleet via Consolidated Logistics Support,” in Proceedings of the 2000 Winter SimulationConference, pp.1068-1074, Orlando, FL, US, December 2000
doi: 10.1109/WSC.2000.899913
|
5 |
J. J. Zhang, B. Guo, F. Liu, “Model for Evaluating the Operational Readiness of Complex Weapon System During the Mission Preparation Period,” Systems Engineering and Electronics, Vol. 28, No. 10, pp.1533-1537, October 2006
|
6 |
F. Liu, J. Y. Zhao, G. B. Song, “A Model on Evaluating Operational Readiness of an Air Fleet During Mission Ready Time,” Journal of Harbin Institute of Technology, Vol. 40, No. 3, pp.488-491, March 2008
|
7 |
D. D. Ding, J. Lu, B. Wang, “A Novel Readiness Model,” Electronic Product Reliability and Environment Testing,Vol. 28, No. 3, pp.1-5, June2010
|
8 |
Y. Wei, T. X. Xu, D. P. Pang, “Modelling and Simulation Research on Operational Readiness of Naval Gun Weapon Equipment based on Mission,” Journal of Gun Launch & Control, Vol. 4, No. 4, pp.15-19, December 2010
|
9 |
W. Han, C. Li, X. H. Sang, “Study on theReadiness Rate of Air Fleet based on Markov Model,” Aircraft Design, Vol. 31, No. 4, pp.60-63, August2011
|
10 |
D. H. Ding, “Readiness Model Expressed with Parameters of RMS Supportability of LRUs,” ElectronicProduct Reliability and Environment Testing, Vol. 30, No. 1, pp.1-5, February 2012
|
11 |
C. Dong, J. Y. Zhang, P. Wang, “Research on Model of Storage Operational Readiness Rate for Torpedo,” Fire Control & Command Control, Vol. 39, No. 9, pp.1552-1556, September 2014
|
12 |
X. T. Cui, L. B. Wang, andG. Lu, “Research of Evalution Model of Missile Equipment Readiness Rate based on the Diffusion Process,” Systems Engineering-Theory & Practice,Vol. 35, No.4, pp.1035-1040, April 2015
|
13 |
M. Z. Ruan, Y. W. Peng, Q. M. Li, “Optimization of Three-Echelon Inventory Project for Equipment Spare Parts based on System Support Degree,” Systems Engineering-Theory & Practice, Vol. 32, No. 7, pp.1623-1630, July 2012
|
14 |
J. L. Li, K. N. Teng, J. H. Xu, “Military Aircraft Fleet Operational Readiness Research,” Modern Defence Technology, Vol. 45, No. 3, pp.147-154, June 2017
|
15 |
G. R. Xie, J. W. Lv, and Y. F. Xu, “Multi-Level Coordinated Optimization of Major Weapon Equipment’s Overall Operational Readiness Indicators,” Systems Engineering and Electronic, Vol. 39, No. 12, pp.2729-2737, December 2017
|
16 |
B. Cheng, Y. J. Lu, and Y. Zhou, “Research Progress on Weapon System-of-Systems Optimization Methods,” Systems Engineering and Electronics, Vol. 34, No. 1, pp.85-90, January 2012
|
17 |
X. Hua, “Queuing Theory and Stochastic Service System, ” Translation Publishing Company, Shanghai, 1987
|