|
R. Ahmad, and S. Kamaruddin, “Maintenance decision-making process for a multi-component production unit using output-based maintenance technique: a case study for non-repairable two serial components unit, “International Journal of Performability Engineering”, vol. 9, no.3, pp.305-319, 2013
|
|
H. Aytug, M. Khouja and F.E. Vergara, “Use of genetic algorithms to solve production and operations management problems: a review”, International Journal of Production Research, vol. 41, no.17, pp.3955-4009, 2003
|
|
Z. Blázsik, C. Imreh and Z. Kovács, “Heuristic algorithms for a complex parallel machine scheduling problem”, Central European Journal of Operations Research, vol. 16 no. 4, pp. 379-390, 2008
|
|
F.T. Chan, and H. K. Chan, “A comprehensive survey and future trend of simulation study on FMS scheduling”, Journal of Intelligent Manufacturing, vol. 15, no. 1, pp.87-102, 2004
|
|
S.E Cieniawski, J. W. Eheart and S. Ranjithan, “Using genetic algorithms to solve a multi objective groundwater monitoring problem”, Water Resources Research, vol.31, no.2, pp.399-40, 1995
|
|
D. Davendra, I. Zelinka, Bialic M. Davendra, R. Senkerik and R Jasek, “Clustered enhanced differential evolution for the blocking flow shop scheduling problem”, Central European Journal of Operations Research, vol. 20, no.4, pp.679-717, 2012
|
|
R.A. Dudek, S.S. Panwalkar, and M.L. Smith, “The lessons of flowshop scheduling research”, Operations Research, vol. 40, no.1, pp.7-13, 1992
|
|
G. Ettaye, Abdellah El Barkany and Ahmed El Khalfi, “Integrating Production and Maintenance for a Multi-Lines System”, International Journal of Performability Engineering, vol.13, no.1, p.29, 2017
|
|
L. Gaafar, “Applying genetic algorithms to dynamic lot sizing with batch ordering”, Computers & Industrial Engineering, vol. 51, no. 3, pp.433-444, 2006
|
|
A. Hamzadayi, and G. Yildiz, “Event driven strategy based complete rescheduling approaches for dynamic m identical parallel machines scheduling problem with a common server”, Computers & Industrial Engineering, vol. 91, pp.66-84, 2016
|
|
? Haz?r and S. Kedad-Sidhoum, “Batch sizing and just-in-time scheduling with common due date”, Annals of Operations Research, vol. 213, no.1, pp.187-202, 2014
|
|
C. He, H. Lin, Y. Lin and J. Tian, “Bi-Criteria scheduling on a series-batching machine to minimize maximum cost and makespan”, Central European Journal of Operations Research, vol. 21, no.1, pp.177-186, 2013
|
|
P. H. Hsu, H. M. Teng and H. M. Wee, “Optimal lot sizing for deteriorating items with triangle-shaped demand and uncertain lead time”, European Journal of Industrial Engineering, vol. 3, no.3, pp.247-260, 2009
|
|
W.L. Hsu, “On the general feasibility test of scheduling lot sizes for several products on one machine”, Management Science, vol. 29, no.1, pp.93-105, 1983
|
|
C. J. Hyun, Y. Kim and Y.K. Kim, “A genetic algorithm for multiple objective sequencing problems in mixed model assembly lines”, Computers & Operations Research, vol. 25, no. 7, pp.675-690, 1998
|
|
M. Ji, D. Yao, J. Ge and T.C.E. Cheng, “Single-machine slack due-window assignment and scheduling with past-sequence-dependent delivery times and controllable job processing times”, European Journal of Industrial Engineering, vol. 9, no.6, pp.794-818, 2015
|
|
C. H. Lee, C. J. Liao and C.W. Chao, “Unrelated parallel machine scheduling with dedicated machines and common deadline”, Computers & Industrial Engineering, vol. 74, pp.161-168, 2014
|
|
J. Liu, L.Wu, and Z. Zhou, “A time-varying lot size method for the economic lot scheduling problem with shelf life considerations”, European Journal of Industrial Engineering, vol. 2, no.3, pp.337-355, 2008
|
|
X. Liu, W. Wang, F. Zhao, and R. Peng, “Joint lot-size and preventive maintenance optimization for a production system”, International Journal of Performability Engineering, vol. 11, no.1, pp.91-96, 2015
|
|
N. Mortezaei, and N. Zulkifli, “Integration of lot sizing and flow shop scheduling with lot streaming”, Journal of Applied Mathematics, 2013.
|
|
C. Pessan, J. L. Bouquard and E. Neron, “An unrelated parallel machines model for an industrial production resetting problem”, European Journal of Industrial Engineering, vol. 2, no. 2, pp.153-171, 2008
|
|
R. Peterson and E.A. Silver, E.A., “Decision systems for inventory management and production planning”, pp. 799-799. New York: Wiley, 1979
|
|
M. Pinedo, “Scheduling: theory, algorithms and applications”,1995
|
|
RISKOptimizer, http://www.palisade.com/riskoptimizer/
|
|
I.W. Soro, D. Ait-Kadi, and M Nourelfath, “Production rate maximization of a multi-state system under inspection and repair policy”, International Journal of Performability Engineering, vol. 8, no. 4, pp.409-416, 2012
|
|
J. Xiao, C. Zhang, L. Zheng and J. N. Gupta, “Mip-based fix-and-optimise algorithms for the parallel machine capacitated lot-sizing and scheduling problem”, International Journal of Production Research, vol. 51, no.16, pp.5011-5028, 2013
|
|
X. Yu, B. Ram and X. Jiang, “Parameter setting in a bio-inspired model for dynamic flexible job shop scheduling with sequence-dependent setups”, European Journal of Industrial Engineering, vol. 1, no. 2, pp.182-199, 2007
|